A villa renovation in Dubai usually costs from about AED 500 per square metre for basic cosmetic work to AED 5,000 or more for a high end, structural renovation, with most mid range projects falling between AED 1,500 and AED 2,800. Published guides put a complete three bedroom villa renovation at roughly AED 600,000 to AED 1 million. This villa renovation cost Dubai guide also covers kitchens, bathrooms and apartments, the factors behind each number and how to plan a realistic budget.
Treat every number here as a guide: costs change with the job, the property, the materials and the area, so your real figure comes from a quote after a survey.

How Renovation Pricing Works in Dubai
Contractors price renovations in Dubai either by the square metre or as a total built up room by room and trade by trade. The rate is a useful first check, but the scope of the project decides the final bill: two villas of the same size can differ widely when one needs paint and the other needs new pipes, rewiring and a reworked plan.
A good quote separates design, demolition, structural work, MEP, waterproofing, joinery, finishes and approvals, so homeowners can see where the money goes and compare quotes for the same property fairly.
Villa Renovation Cost by Level
These are the bands Intex Aura works with for a villa renovation in Dubai, per square metre of renovated area.
| Renovation level | Typical scope | Indicative cost (AED per square metre) |
|---|---|---|
| Basic | Painting, new flooring, lighting, minor upgrades, no structural changes | 500 to 1,200 |
| Mid range | New kitchens and bathrooms, rewiring, joinery, reconfigured rooms | 1,500 to 2,800 |
| High end | Natural stone, marble, bespoke joinery, smart systems, pools, structural work | 2,500 to 5,000 or more |
As a check, 300 square metres of mid range work at these rates comes to roughly AED 450,000 to AED 840,000 before any outdoor works. Market guides give similar totals for whole villa projects: an average of around AED 600,000 to AED 1 million for a three bedroom villa, AED 600,000 to AED 1.4 million for four or five bedrooms, and more than AED 3.5 million for the largest luxury renovations in Dubai with structural modifications and imported finishes. A townhouse usually costs less than a standalone villa.
What Drives Renovation Costs in Dubai
The factors below have the biggest effect on a quote, heaviest first.
| Cost driver | Why it changes the cost | Lower cost | Higher cost |
|---|---|---|---|
| Size | More area, more materials and labour | One room | Whole villa, garden and roof |
| Scope | Each trade adds labour | Paint, floors, lighting | Complete strip out |
| Materials and finishes | Higher quality materials can double a room’s price | Porcelain, laminate | Stone, quartz, custom joinery |
| Layout and structure | Needs drawings and engineering | Plan kept | Walls removed, extensions |
| Plumbing and electrical | Walls and floors opened | Like for like swaps | Wet rooms moved, full rewire |
| AC and MEP | Ducts and capacity are costly to change | System serviced | New zones, smart systems |
| Permits | Fees, drawings and waiting time | Simple NOC | Authority permits |
| Condition | Hidden damage appears after demolition | Newer home | Older villa, leaks, old wiring |
| Timeline and access | Rushed or restricted work costs more | Flexible programme | Tight deadline, limited hours |
Plumbing and electrical work on its own is often budgeted at roughly AED 5,000 to AED 40,000 or more across a home, depending on how much is moved or replaced.
Permits, NOCs and community approvals
Cosmetic work such as painting generally needs no major permit, though the developer or building management may still want a No Objection Certificate (NOC). Structural, extension and drainage work needs approval from Dubai Municipality or the relevant authority, and each community sets its own rules on hours and contractor access. Published guides put permit fees at a few hundred dirhams to around AED 15,000, and some buildings take a refundable deposit. Approvals cause delays when left late, so planning them in from day one protects the budget.
Heat, air conditioning, sand and dust
Long, hot summers make insulation, glazing and the air conditioning part of the renovation rather than an afterthought, and the right upgrade lowers running costs and adds value for years. Fine sand calls for sealed finishes, good door seals and protection of the home during the works. Waterproofing in wet rooms, roofs and terraces is the one line never to cut, because a failure behind new tiles is far more expensive to repair than to prevent.
Kitchen Renovation Cost Dubai
A kitchen renovation can range from a makeover that keeps the existing carcasses to a full remodel with a new plan. Published Dubai ranges are wide:
| Kitchen scope | What usually changes | Typical published range (AED) |
|---|---|---|
| Makeover | Cosmetic upgrades: doors wrapped or replaced, new countertops, handles, lighting, backsplash | 15,000 to 50,000 |
| Mid range remodel | New cabinets in a similar plan, quartz countertops, new appliances, some services moved | 50,000 to 120,000 |
| Luxury or new layout | Island, custom joinery, premium stone, integrated appliances, storage walls | 120,000 to 250,000 or more |
Cabinetry usually accounts for 30% to 40% of the kitchen budget, so it is the first place to trim. Where structural, wet area or electrical circuit changes need a Dubai Municipality permit, it typically costs AED 500 to AED 2,500, and Intex Aura prepares the documents. Our kitchen renovation page shows every option, and our guide to the best flooring for kitchens compares water resistant floors.

Bathroom Renovation Cost Dubai
Intex Aura publishes these bands for Dubai bathrooms:
| Bathroom type | Typical scope | Indicative cost (AED) |
|---|---|---|
| Guest bathroom refresh or standard full bathroom | Fresh tiling, a new vanity, WC and shower with lighting; a full job also strips the room and waterproofs it | 15,000 to 35,000 |
| Master bedroom or en suite bathroom | A bigger space with a walk in shower, a bath, twin basins and better tiles | 35,000 to 70,000 |
| Spa style luxury bathroom | Stone or marble walls, a freestanding tub, heated floors, smart showers and a made to order vanity | 70,000 to 120,000 or more |
Size, plan changes, fixtures, fittings, materials and the state of the old pipework decide where a job falls. Keeping the toilet, shower and basin where they are is the simplest way to control the price, because moving them means new drainage and falls. In our bathroom renovation work we water test each wet floor before any tiling, and ventilation is planned in against Dubai’s humidity.

Apartment Renovation Cost Dubai
Apartment renovation in Dubai costs less overall than a villa: there is less space, no garden or roof, and simpler systems. Published guides put apartment renovation at roughly AED 50 to AED 200 per square foot for standard work, rising to around AED 350 to AED 600 per square foot for luxury finishes. By scope:
| Apartment renovation scope | Typical unit | Published range (AED) |
|---|---|---|
| Light refresh: paint, repairs, some flooring and lighting | Studio or one bedroom | 25,000 to 60,000 |
| Targeted upgrade: a kitchen or bathroom plus floors and paint | One or two bedroom | 60,000 to 180,000 |
| Full mid range renovation | Two or three bedroom | 120,000 to 320,000 |
| Premium or penthouse level | Any size | 250,000 to 600,000 or more |
Apartments carry hidden costs that villas often do not, and fittings must suit tower rules. Building management sets working hours, asks for service lift bookings for deliveries and debris, and may require corridor protection and a deposit. Drainage positions are set by the tower’s design, so relocating a kitchen or bathroom is often limited, and waterproofing protects the neighbours underneath, not only your unit. Our apartment renovation page covers the planning of full and partial jobs around these rules.

How to Plan Your Renovation Budget

Good budgeting starts with the total you are comfortable spending, then works backwards:
- Keep a contingency. Most guides advise homeowners to keep 10% to 15% of the renovation cost for hidden problems that only show after demolition.
- Fix the scope at the planning stage. Design changes once a project is under way are the most common cause of extra expenses and delays.
- Spend where it lasts. Fund waterproofing, plumbing and air conditioning first, then kitchens and bathrooms, which add the most resale value. Decorative upgrades and fixtures can follow.
- Phase the work. Splitting it into phases, bathrooms this year and the kitchen next, spreads the cost, and room by room phasing can let you keep living in the home.
- Weigh living in against moving out. Staying saves rent but slows the work; for a full strip out, moving out is often cheaper.
- Compare like with like. Ask all contractors for an itemised quote and check that design, approvals, waterproofing and debris removal are included.
Low market quotes often grow through variations, so a clear scope matters more than the starting rate. For design direction before you set numbers, our villa interior design ideas look at each room in turn.
Get an Itemised Quote From Intex Aura
Intex Aura visits properties anywhere in the UAE free of charge to measure and check the services. After the visit you get a free written quote, priced in AED, with structural work, MEP, joinery and finishes on separate lines. Our 25 years of interior work mean one team stays on the project from measuring day to handover, and we can come at the weekend or in the evening.
See everything a full villa renovation covers, and our flooring and curtains ranges for the finishing stage. To have your own home priced, Book a free site visit.
Renovation Cost FAQs
What is the average villa renovation cost per square metre?
It runs from AED 500 per square metre up to AED 5,000 and beyond. Expect AED 500 to AED 1,200 for basic work, between AED 1,500 and AED 2,800 for mid range projects, and above AED 2,500 for high end renovations.
What does a new kitchen cost in Dubai?
Published ranges run from about AED 15,000 to AED 50,000 for a makeover, AED 50,000 to AED 120,000 for a mid range remodel, and AED 120,000 to AED 250,000 or more for a luxury kitchen. Cabinets usually make up 30% to 40% of that spend.
What should I budget for a new bathroom?
Plan on AED 15,000 to AED 35,000 for a guest bathroom refresh or a standard full bathroom. A master bedroom en suite is usually AED 35,000 to AED 70,000, while a spa style luxury room starts around AED 70,000 and can pass AED 120,000.
Is it cheaper to renovate an apartment than a villa?
Usually, yes. An apartment renovation covers less floor area and simpler systems, so published totals start around AED 25,000 for a light refresh. Building rules on hours, lifts and approvals add costs.
Is a permit needed for renovation work in Dubai?
Cosmetic work generally needs no major permit, but most communities and buildings ask for an NOC first. Structural, extension and drainage work needs authority approval, with fees from a few hundred dirhams to around AED 15,000.
How much contingency should I keep?
Most Dubai guides advise 10% to 15% of the renovation cost. It covers problems that only appear once walls and floors are opened.
How long do villa renovations usually take?
Scope, the property and community approvals all affect it. Small updates can take a few weeks, while published guides put a full villa renovation at several months, plus approval time before work begins.
Is the Intex Aura quote free?
Yes. After a free site visit, Intex Aura sends a free quote in AED, in writing, with each part of the work on its own line. You can then phase or adjust the work before anything starts.
Planning a renovation budget?
We survey your villa or apartment, talk through the scope and follow up with a free itemised quote in AED, starting with a free site visit.