EPDM Flooring

EPDM Flooring Dubai: Poured Rubber Surfacing For Play, Sport And Rooftops

Intex Aura supplies and installs seamless wet pour EPDM rubber flooring for playgrounds, running tracks, school play areas, pool surrounds, rooftops and outdoor gyms across Dubai. Each surface is installed to suit the height of your play equipment, poured in the colours you choose and laid to drain.

5.0 on Google · 25 Years of Experience · Free Site Visit

Multicoloured EPDM rubber playground surface around slides and climbing frames

Two Layers, One Seamless Safety Surface

Wet Pour EPDM Explained

EPDM stands for ethylene propylene diene monomer, a durable synthetic rubber that is non-toxic and weather resistant. Wet pour is mixed, poured and trowelled on site as a two-layer system with no joins.

The base layer is recycled SBR rubber granules bound with polyurethane binder and works as the shock absorber. On top, the wear layer of coloured EPDM granules, usually 10 to 15 mm thick, adds grip, colour and durability.

  • Base layer depth matched to fall height
  • Solid colours, blends and graphics
  • Porous finish that drains straight through
Grey and orange EPDM safety surfacing around a tube slide in a residential playground
Curved multicoloured running lanes poured in rubber with white lane numbers
Red rubber sprint lane between turf strips on a rooftop training area
Bright EPDM rubber granules poured in swirls of yellow, green and orange

Why Do Playground Designers Favour Wet Pour?

It follows curves and organic shapes that tiles cannot, and never lifts at a seam.

Accreditations

From hotel groups to airlines, well-known names have trusted us with their floors.

  • The Dubai EDITION
  • BAT
  • Gerry's dnata
  • Ericsson
  • CAA
  • Bahria Town
  • Packages Group
  • Park View City
  • Qatar Airways

Colours, Patterns And Logos Poured Into The Floor

Two-tone patterns, games, number lines and club logos, poured as graphics through the full depth of the wear layer so they never peel like paint.

Playground surfacing in curved bands of yellow, green, orange and blue
Running track lanes in red, orange, blue and green with numbered lanes
Orange footprint-shaped EPDM patterns set into a grey playground surface
Rooftop training lane in red rubber with white markings
Outdoor sports court with a blue and green playing surface and basketball hoop

Tell Us What The Children Will Climb

Share the area size and your tallest equipment, and we will visit free of charge and send a written quote.

01

Softer Falls

Shock absorption sized to each frame.

02

No Puddles

Drainage runs straight through the surface.

03

Colour That Lasts

UV-stable mixes resist fading.

04

No Seams To Trip On

One continuous pour, edge to edge.

Our Process

From Bare Base To Finished Play Surface

  1. 01

    Site visit

    We check the substrate, levels, drainage and access.

  2. 02

    Equipment heights

    Each free height of fall sets the thickness schedule.

  3. 03

    Layout design

    Colours, designs and graphics drawn up for your approval.

  4. 04

    Base preparation

    Concrete is cleaned and primed, or a compacted sub-base built.

  5. 05

    Pouring both layers

    SBR trowelled to depth, then the EPDM top and inlays.

  6. 06

    Curing and handover

    Left to cure, then handed over with care advice.

Why Choose Us

We Make Your Interior More Modern

Why schools, compounds and villas call us for poured rubber:

Heights Before Price

Equipment heights come first, because they decide the depth.

Binder Named Upfront

Your quote says whether the top uses aliphatic or aromatic binder.

Pours Planned Around Heat

Installation is timed for cooler hours in summer conditions.

Term-Time Friendly

Weekend and holiday installation for schools and commercial gyms.

Dubai Wide

From Jumeirah Village Circle and Al Furjan to Mirdif and Silicon Oasis.

One Written Quote

Free site visit, then a written, itemised quote.

Contact Us

We Create Your Space Better

Send a photo of the area and its equipment, and our flooring team will arrange a visit.

Testimonials

Some Feedbacks From Our Customers

INTEX AURA Decoration Design & Fit-out LLC

5.0★★★★★

Based on 5 reviews

powered by

review us on

ARSLAN SIPRA OFFICIAL

★★★★★

Great experience with INTEX AURA Decoration Design & Fit-out LLC! The team was polite, professional, and delivered exactly what I wanted. Smooth work, good quality, and very cooperative staff. Highly recommended!

Playing Human

★★★★★

Great job and very efficient and cost effective

Qalb e Momin

★★★★★

Highly recommended and trustworthy. They completely transformed the interior look of our flat.

Samir Malayil

★★★★★

Installed blinds. Excellent work.

Abeer Ahmed

★★★★★

They painted my room and corridor in two totally different colors (very light and very dark) and did an amazing job. Super professional, easy to deal with, and left everything clean. Highly recommend.

Safety

Thickness And Critical Fall Height

Critical fall height is the highest fall onto a surface that should not cause a serious head injury. It is tested to EN 1177, one of the playground standards consultants cite, and it must equal or exceed the free height of fall of the equipment above. As a typical guide, 20 to 25 mm suits a 1 m fall, rising to 100 mm or more above 3 m.

EN 1177 rates the impact performance of the whole tested system, meaning granules, binder, base layer and substrate together, not thickness alone. We confirm the build-up for your equipment in writing, so the safety requirements are clear before installation.

Climate

UV Resistance And Colour Stability In Dubai's Sun

EPDM granules are UV resistant, so the binder decides how the colours age. Aromatic polyurethane costs less but ambers in strong sun, dulling brights within a couple of summers. Aliphatic binder gives far better colour stability and appearance, so we recommend it for exposed playground flooring, tracks and rooftops. Lighter colours also stay cooler in peak heat.

Claim A Flat 10% Discount On EPDM Flooring

Mention this offer when you book and take 10% off your new poured rubber surface.

Faded Or Worn Rubber Surface? We Can Re-Top It

Care

Rubber Surfacing Maintenance: Cleaning, Top-Ups And Repairs

  • Sweep or blow off sand weekly so the pores stay open.
  • Wash down with a mild detergent; avoid solvents.
  • Check slide exits and swing landings, where wear starts.
  • Worn patches can be cut out and re-poured as local repairs.
  • Top-ups with a fresh EPDM layer revive tired but sound floors.
  • Cared for this way, a well specified surface often lasts 10 years or more.

Compare

Wet Pour Or Rubber Tiles?

EPDM rubber flooring also comes as tiles and rolls. Tiles suit indoor gyms and are quick to install, but outdoors their joins can open. Wet pour is durable, has no seams, takes any shape and drains evenly, which is why it leads for playground projects and tracks. Anyone comparing EPDM flooring UAE contractors offer should ask about binder, depth and base, as these set performance and budget.

EPDM Flooring In Dubai: Your Questions

Is EPDM comfortable for barefoot play on hot afternoons?

Any outdoor surface warms in direct sun, dark rubber most. Light colours, shade sails and play at cooler hours keep it safe and comfortable.

Why do some playground surfaces go yellow?

Usually the binder. Aromatic polyurethane suits indoor areas but fades under UV, while aliphatic keeps colours bright for years.

Can EPDM go over existing concrete or asphalt?

Often, yes, if the substrate is sound and drains. Cracked areas are repaired first, because the poured surface copies what lies beneath.

Will water sit on the surface after rain?

No. Wet pour is porous, so rain soaks through to the substrate and runs off along its falls. Regular sweeping keeps the pores open.

Can you pour our school logo or a hopscotch grid?

Yes. Logos, letters and other graphics are poured as part of the top layer. The colour runs through its depth, so they outlast painted designs.

Do we need a whole new floor if one area wears through?

Rarely. Worn spots can be cut out and re-poured, although colour matching a patch on an aged surface is never exact.

When can children use the surface after pouring?

The surface must cure, and heat and humidity change how long that takes. Light use is typically possible after 24 to 48 hours, though timings vary by job.

Is wet pour dearer than rubber tiles?

On small areas it usually is. Cost depends on area, thickness, colours, graphics, binder type and substrate condition, and we price residential and commercial jobs in writing after a free visit.

Our Collection

Our Latest EPDM Flooring Dubai Collection

Recent EPDM flooring Dubai projects include villa play corners, compound playgrounds and rooftop sprint lanes. Time on site for a play area depends on its size, and we'll confirm it after the site visit.

Our office

Office 1-137, 1st Floor
Al Masraf Bank Building
Al Qouz 1, Sh. Zayed Road
Dubai

Contact on WhatsApp